This client demanded high quality architectural and engineering design, with innovative services systems and leading-edge water treatment technology. The 80 x 54m building forms two hull-like roof shells, resting on inverted “keel” columns. The two-storey glazed “shopfront” façade displays activity from Waverley Road through to the outdoor pool and garden.
Leading edge operating systems that were used in this project include building automation system, automated water treatment controls, heat recovery, real-time monitoring of key systems including water quality, automated lighting controls and UV-chlorine treatment systems.